Continuous Optimization

Retro-Commissioning

Milwaukee Central Library – Chiller Plant - Milwaukee, WI (2005)

Commissioned a new TAC LonWorks based DDC control system serving the central chiller plant comprised of a new 300-ton Trane screw water chiller, existing 300-ton York screw chiller, existing 350-ton McQuay screw chiller, chilled water pumps, condenser water pumps and cooling tower system (2005).