Commissioned HVAC system for new 35,000 sq. ft. church building addition. System was comprised of 184 tons of gas-fired heat/cool Aaon rooftops (seven units). Two 40-ton units served a 1,060 seat auditorium and one 30-ton unit served a 300 seat fellowship hall. These units were equipped with Alerton BACnet DDC controllers. The Alerton Visual Logic graphical programming language was learned and the systems were commissioned in real time while services were being held.