Continuous Optimization

Re-Commissioning

Health Care and Laboratories

Royal Columbian Hospital, New Westminster, B.C. – 593,337 sq.ft.

Enhanced the dynamic graphics of 17 HVAC systems on the head-end computer. Re-commissioning included the review all of the process code of the stand-alone DDC panels and hands-on fine-tuning the HVAC system control strategies and process code (1986).