Continuous Optimization

Re-Commissioning

Health Care and Laboratories

Mission Memorial Hospital, Mission, B.C. – 120,000 sq.ft.

Re-commissioning included the review of all the DDC process code of the HVAC system control sequences. Implemented new energy savings strategies and fine-tuned the DDC systems where possible (1986).