Continuous Optimization

Re-Commissioning

Health Care and Laboratories

St. Mary’s Hospital, New Westminster, B.C. – 150,206 sq.ft.

Re-commissioning included the review of all the DDC process code of the HVAC system control sequences. Implemented new energy savings strategies and fine-tuned the DDC systems where possible. Trained seven shift engineers in the operation and troubleshooting of the DDC control system and head-end computer (1986).