Continuous Optimization

Re-Commissioning

Health Care and Laboratories

Surrey Memorial Hospital, Surrey, B.C. – 337,687 sq.ft.

Re-commissioning included the review of all the process code for 11 stand-alone DDC control panels, enhancing the dynamic graphics of the head-end computer to make them useful from a Building Operator's perspective and fine-tuning the control strategies and computer process code of the DDC systems of the major HVAC systems (1986).