Retrofit Design

Health Care and Laboratories

St. Nicholas Hospital Energy Retrofit Design, Sheboygan, WI – 251,377 sq.ft.
Supervised the design of a package of HVAC system retrofit measures with an installed construction cost of approximately $175,000 (1996).